MINISTRY OF ELECTRIC POWER

Breaking News :

BAGO DIVISION


EPGE

Zaungtu

1

Location

−

Bago Township, Bago Region

2

River

−

Bago

3

Construction Starting Date

−

1.1.1994

4

Commercial Running Date

−

2000

5

Installed Capacity

−

20 MW (2 × 10 MW)

6

Rated Head 

−

89.9 ft

7

Type of Turbine 

−

Kaplan (Vertical)

8

Discharge

−

2 × 1539 ft3/s = 3078 ft3/s

9

Annual Design Generation

−

76 GWh

10

Transmission Line

−

66 kV Zaungtu-Kamanat Line (45.6) miles

11

Penstock

−

672 ft  (2) Nos (f - 16.4 ft)

Zaungtu


Yenwe

1

Location

−

Kyauktaga Township, Bago Region

2

Creek

−

Yenwe

3

Construction Starting Date

−

2001

4

Commercial Running Date

−

2007

5

Installed Capacity

−

25 MW (2 × 12.5 MW)

6

Rated Head 

−

187 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

2 × 883 ft3/s = 1766 ft3/s

9

Annual Design Generation

−

123 GWh

10

Transmission Line

−

33 kV Yenwe-Thayagone Line 1) & (2) (18.5) miles

11 kV Dam Line  (13.5) miles

11

Penstock

−

508 ft (f - 18 ft)

Yenwe


Kabaung

1

Location

−

 Oaktwin Township, Bago Region

2

Creek

−

Kabaung

3

Construction Starting Date

−

2002-2003

4

Commercial Running Date

−

2008

5

Installed Capacity

−

30 MW (2 × 15 MW)

6

Rated Head 

−

152 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

2 × 1395 ft3/s = 1766 ft3/s

9

Annual Design Generation

−

120 GWh

10

Transmission Line

−

33 kV Kabaung-Taung Oo Line (1) & (2) (15) miles

11

Penstock

−

210 ft (f - 21 ft)

 

     Kabaung


Shwegyin

1

Location

−

 Shwegyin Township, Bago Region

2

Creek

−

Shwegyin

3

Construction Starting Date

−

2002-2003

4

Commercial Running Date

−

2011

5

Installed Capacity

−

75 MW (4 × 18.75 MW)

6

Rated Head 

−

135.8 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

4 × 1900 ft3/s = 7600 ft3/s

9

Annual Design Generation

−

262 GWh

10

Transmission Line

−

230 kV Thayagone Line miles (25) miles 11 kV Madauk Line (11) miles

11

Penstock

−

1100 ft , (2) Lines (f - 25 ft)

Shwegyin


Kun Chaung

1

Location

−

 Phyu Township, Bago Region

2

Creek

−

Kun

3

Construction Starting Date

−

2002-2003

4

Commercial Running Date

−

2012

5

Installed Capacity

−

60 MW (3 × 20 MW)

6

Rated Head 

−

347 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

3 × 777 ft3/s = 2331 ft3/s

9

Annual Design Generation

−

190 GWh

10

Transmission Line

−

230 kV Kun-Taungoo Line (37.304) miles

230 kV Kun-Thayagone Line (30.82) miles

11

Penstock

−

1295 ft  (f - 15 ft)

Kun Chaung


Thauk Ye Khat No. (2)

1

Location

−

 Taungoo Township, Bago Region

2

Creek

−

Thauk Ye Khat

3

Construction Starting Date

−

2007-2008

4

Commercial Running Date

−

2013

5

Installed Capacity

−

120 MW (3 × 40 MW)

6

Rated Head 

−

269 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

3 × 2489.3 ft3/s = 7468 ft3/s

9

Annual Design Generation

−

604 GWh

10

Transmission Line

−

230 kV Taungoo Line (13.09) miles

11

Penstock

−

1972 ft f - 28 ft, (1) No

Thauk Ye Khat No. (2)


Phyu Chaung

 

1

Location

−

 (7) miles West of Phyu Township, Bago Region

2

Creek

−

Phyu

3

Installed Capacity

−

40 MW (2 × 20 MW)

4

Rated Head 

−

337 ft

5

Type of Turbine 

−

Francis (Vertical)

6

Annual Design Generation

−

120  GWh

Phyu Chaung


ShweTaung

1

Location

−

Shwe Taung Township, Bago Region(Western)

2

Commercial Running Date

−

16.2.1982  (Machine -1)

5.6.1982 (Machine-2)

16.4.1984 (Machine -3)

3

Total Installed Capacity

−

55.35 MW (3 × 18.45 MW)

4

Type of Machine 

−

 Gas Turbine  GE Frame 5

(JOHN BROWN  Co., Ltd )

ShweTaung


DPTSC

230 kV Transmission Line 

Bago Division

Sr.

Name of Transmission Line

Conductor

Size

Distance

(Mile)

Number

of Tower

1

230 kV Taungoo- Phyu-Kun- Tharyargone(1)

795 MCM

60.55

307

2

230 kV Phyu Plant In/Out

795 MCM

5.00

26

3

230 kV Kun Plant In/Out

795 MCM

3.61

20

4

230 kVBa Lu Chaung (2) - Taungoo

795 MCM

95.52

383

5

230 kV Shwetaung - Minhla

605 MCM

65.39

270

6

230 kV Minhla - Myaungtagar

605 MCM

62.96

252

7

230 kV Shwetaung - Taungdwingyi

605 MCM

98.12

384

8

230 kV Shwetaung(Myaungtagar)-Hlawgar
(Single Circuit)

605 MCM

19.14

84

9

230 kV Thaephyu - Taungoo

265/35 sqmm

40.28

209

10

230 kV Kamarnat - Sittaung

605 MCM

36.60

136

11

230 kVTaungoo – Tharyargone (2)

605 MCM

60.10

266

12

230 kVTharyargone – Kamarnat (1)+(2)

605 MCM

58.80

260

13

230 kVShwekyin - Tharyargone

605 MCM

25.62

106

14

230 kVShwetaung- Oakshinpin

605 MCM

25.60

111

15

230 kVShwetaung - Myaungtagar
(Double Circuit)

605 MCM

131.61

554

16

230 kV Oakshinpin - Toungup

795 MCM

54.41

206

17

230 kV Taungdwingyi – Shwetaung (D/C)

605 MCM

104.00

429

 


 

66 kV Transmission Line

Bago Division

Sr.

Name of Transmission Line

Conductor

Size

Distance

(Mile)

Number

of Tower

1

66 kV Shwetaung - Pyi

336.4 MCM

9.64

55

2

66 kV Shwetaung-Textile industry

100 sqmm

1.00

12

3

66 kV Shwetaung- Nuthmaw

266.8 MCM

4.00

46

4

66 kV Zaungtoo - Kamarnat

185 sqmm

45.25

646

5

66 kV Shwetaung – Hsintae

397.5 MCM

11.50

133

6

66 kV Hsintae – Nyaungchayhtauk

397.5 MCM

20.00

259

7

66 kV Oakshinpin-(Kapasa-6)

336.4MCM

4.40

32

8

66 kV Hsintae - Oakshinpin

397.5 MCM

17.30

282

9

66 kV Oakshinpin - Mathone

397.5 MCM

12.20

188

10

66 kV Kasala (5) - Kwinhla

266.8 MCM

0.94

13

11

66 kV Kamyaing – kapasa (5)

336.4 MCM

2.50

33

12

66 kV Shwetaung-Kyaukswyalkyoe

397.5 MCM

32.00

448

13

66 kV Shwetaung-Paukkhaung

795 MCM

44.00

677

 


33 kV Transmission Line

Bago Division

Sr.

Name of Transmission Line

Conductor

Size

Distance

(Mile)

Number

of Tower

1

33 kV Yenwe - Tharyargone

397.5MCM

17

336

2

33 kV Khapaung – Taungoo (1)

95sqmm

15.57

300

3

33 kV Khapaung – Taungoo (2)

400/35sqmm

15.57

286

 

230 kV Primary Substation (Bago Division) (2022, September)

No

Substation

Voltage ratio

(kV)

Capacity

(MVA)

Total

Capacity

(MVA)

Location

1

Kamarnat

230/33/11

100

160

Bago District,  Bago Township

230/33/11

60

2

Taungoo

230/33/11

100

100

Oaktwin Township

3

Tharyargone

230/33/11

100

100

Bago District,

 Kyauktagar township

4

Thaephyu

230/33/11

100

100

Yaetarshae township, Myohla, Thaephyu village

5

Oakshinpin

230/66/11

100

100

Pyi district, Pantaung township,

Oakshinpin

6

Minhla

230/33/11

100

100

Tharyarwady district, Minhla Township Oakshinpin

7

Binda

230/33/11

60

60

Nyaunglaybin Town ship, Bago Division

Total capacity (MVA)

720

 

 

 

 

 

 

 

 

 

1.  230 kV Kamarnat Primary Substation

1.  Location           

     Bago Township, Bago District, Bago Division

2.  Area                 

     (98.77) Acre

3. Commissioning Date

     (1-July-1995)

4.  Transformer Capacity 

     230/33/11 kV      100 MVA (Areva, Indonesia)

     230/33/11 kV       60   MVA (ABB, Sweden, Thailand)

                Total      160 MVA

5. Transmission Lines and Distribution Feeders

     (A) 230 kV Transmission Lines

            (1)   Tharyargone  Line

            (2)   Binder Line

            (3)   Thanlyn Line

            (4)   Sittaung Line

            (5)   Myaungtagar Line

     (B)   66 kV Transmission Line

            (1)   Zaung-tu Line

     (C)   33 kV Distribution Feeders

            (1)   Bago (1) Feeder

            (2)   Bago (2) Feeder

            (3)   Nyaung-inn Industrial Zone (1) Feeder

            (4)   Nyaung-inn Industrial Zone (1) Feeder

            (5)   Sittaung (Wall) Feeder

            (6)   Chin-su Industrial Zone Feeder

            (7)   Phayar-kyi+Aye-thukha

            (8)   FeederThaenatpin Feeder 

            (9)   Myanmar Economic Corporation Feeder

6.  Distibution Regions

Bago Township, Phayar-kyi Township, Aye-thu-kha Township,

Tha-nut-pin Township, Inn-takaw Township and Kaw

 

2.  230 kV Taungoo Primary Substation

1. Location            

    Oak-twin Township, Taung-gu District, Bago Division (East)

2. Area        

    (21.16)Acre

3. Commissioning Date

    (15-June-1963)

4. Install Capacity                                                  

    230/33/11 kV      100 MVA (ABB, Sweden)

    Total                   100 MVA                       

5. Transmission Lines and Distribution Feeders

    (A)    230 kV Transmission Lines

               (1) Law-pita Line

               (2) Thaephyu Line

               (3) Tharyargone (1) Line

               (4) Tharyargone (2) Line

               (5) Thaukyaekhat Line

    (B)    33 kV Distribution Feeders

              (1) Southern General Headquarter (South Division) Feeder

              (2) Taungoo(Rakhine Su) Feeder

              (3) Zayyawaty Feeder

              (4) Sugar Factory Feeder       

              (5) Htan-ta-pin Feeder

              (6) Kha-paung (1) Feeder

              (7) Kha-paung (1) Feeder

              (8) Theinoo Feeder

    (C)    11 kV Distribution Feeders

              (1) U-yin-taw Lumbertard Feeder

              (2) Wae-daunt Feeder

              (3) Nat-sin-gone Feeder

              (4) Line office+ Hydro Feeder           

6. Distribution Regions

TaungooTownship, Kay-tu-matiMyoeThit, Htan-ta-pin Township, Oak-twin Township,

 Kywe-pwe Township, Zay-ya-waty Township, Tan-taung-gyi Township, Tan-taung-lay Township

 

3. 230 kV Tharyargone Primary Substation

1. Location  

     Kyauk-Tan-Khar Township, Bago District, Bago Division

2.  Area                 

     (108.26) Acre

3. Comissioning Date

     (12-December-2006)

4.  Install Capacity          

     230/33/11kV,   100 MVA (GE, Indonisia)

     Total               100 MVA

5. Transmission Lines and Distribution Feeders

     (A) 230 kV Transmission Lines

               (1) Taungoo (1) Line

               (2) Taungoo (2) Line

               (3) Kamarnat (1) Line

               (4) Kamarnat (2) Line

               (5) Hlawgar Line

               (6) Shwekyin Line

     (B)   33 kV Distribution Feeders

              (1) Yenwe (1) Feeder

              (2) Yenwe (2) Feeder

              (3) Daik-Oo Feeder

              (4) Pyuu Feeder

6.  Distribution Regions

Pyuu Township, Fa-Doo Township , Nyaung-Lay-Pin Township , Purn-Tan_Sar Township ,

Daik_Oo Township, Kyauk-Tan_KharTownship,Pell-Nwe-Kone Township, Ka-Nyut-Koon

Township, Nat-Thann-Kun Township, Aung-Myin Township         

 

4. 230 kV Thaephyu Primary Substation

1. Location  

     Myoe-Hla Township, Yae-Tar-Shay Township, TaungooDistrict, Bago Division

2.  Area                                                                

     (42.95) Acre

3. Comissioning Date

     (24-December-2007)

4.  Transformer Capacity           

     230/33/11 kV   100 MVA (Areva, China)

     Total               100 MVA          

5. Transmission Lines and Distribution Feeders

     (A) 230 kV Transmission Lines

               (1) Pyinmana Line

               (2) Taungoo Line

     (B) 33 kV Distribution Feeders

              (1) Thar-gara Industrial Zone (1) Feeder

              (2) Thar-gara Industrial Zone (2) Feeder

              (3) Paper Chemistry (1) Feeder

              (4) Paper Chemistry (2) Feeder

              (5) Max Myanmar Feeder

              (6) (Yae-Ni)-(Yae-Tar-Shay) Feeder 

              (7) Industry-Porcelain Feeder

              (8) Brick Factory (Pan-Tin) Feeder

              (9) Lei-Way Cantonment+ River Water Pump Feeder

             (10) Air Raid Defence Feeder             

6.   Distribution Regions

Yae-Ni Township, Myoe-Hla Township,  Thargara Township,

Yae-Tar-Shay  Township , Thar-Witt-Htee Township

 

5. 230 kV Oakshinpin Primary Substation

1. Location  

     Pan-Taung Township, Pyay District, Western Bago Division

2.  Area                 

     (50.51) Acre                

3. Comissioning Date

     (6-March-2010)

4.  Transformer Capacity           

     230/66/11kV   100 MVA (Areva, China)

     Total             100 MVA

5. Transmission Lines and Distribution Feeders

     (A) 230 kV Transmission Lines

               (1) Shwetaung Line

               (2) Toungup Line

     (B)   66 kV Transmission Lines

              (1) Nyaung-Chay-Htaut Line

              (2) Kan-Ma Line

              (3) Sin-Tel Line

              (4) Ma-Thone Line

              (5) Myan-Aung Line

              (6) Ka-Myaing Line

6.  Distribution Regions

Oakshinpin Township, Pann-Taung Township, Min-Tone Township,

Kan-Ma Township, Myan-Aung Township, Ka-Pa-Sa(3,5,6,9,16)

 

6. 230 kV Minhla Primary Substation

1. Location  

    Minhla Township, Thar-yar-wady District, Bago Division

2. Area                  

    (50.41) Acre

3. Commissioning Date

    (31-April-2013)

4.   Install Capacity 

    230/33/11 kV       100 MVA (LEEEC, China)        

    Total                  100 MVA

5. Transmission Lines and Distribution Feeders

    (A)    230 kV Transmission Lines

              (1) Shwetaung Line

              (2) Myaungtagar Line

    (B)    33 kV Distribution Line

             (1) Zegone Feeder

             (2) ThoneSae Feeder

             (3) Moe nyo Feeder

             (4) LatPaDan Feeder

6. Distribution Regions

Moe-nyoTown, Owe-the-kone Town, Aye-mya-thar-yar, Oak-pho,

Kyoe-pin-kauk, Zee-gone and Nat-ta-lin Township

 

7. 230 kV Bindar Primary Substation

1. Location  

    Nyaunglaybin Township, Bago District (east), Bago Division

2. Area                  

    (29.18) Acre

3. Commissioning Date

    (25-April-2020)

4.   Install Capacity 

    230/33/11 kV       60 MVA (Hitachi, Japan)        

    Total                  60 MVA

5. Transmission Lines and Distribution Feeders

    (A)    230 kV Transmission Lines

              (1) Tharyargone Line

              (2) Kamarnat Line

    (B)    33 kV Distribution Line

             (1) Dike Oo Feeder

             (2) Nyaung-lay-bin Feeder

6. Distribution Regions

   Nyaung-lay-bin Township, Dike Oo Township


ESE

 