MINISTRY OF ELECTRIC POWER

Breaking News :

Kayah State


Baluchaung No. (1)

1

Location

−

Loikaw Township, Kayah State

2

Creek

−

Baluchaung

3

Construction Starting Date

−

1987

4

Commercial Running Date

−

1992

5

Installed Capacity

−

28 MW (2 × 14 MW)

6

Rated Head 

−

228.5 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

2 × 840 ft3/s = 1680 ft3/s

9

Annual Design Generation

−

200 GWh

10

Transmission Line

−

132 kV BHP (2) Line (9.3) miles

11 kV Loikaw Line (10.5) miles

11 kV Dawtachar Line (5.5) miles

11

Penstock

−

520.66 ft (f - 12.5 ft ~ 6.9 ft)

ဘီလူးချောင်း (၁)


Baluchaung No. (2)

 

1

Location

−

Loikaw Township, Kayah State

2

Creek

−

Baluchaung

3

Construction Starting Date

−

1954, Machine - 1, 2, 3

1970, Machine  - 4, 5, 6

4

Commercial Running Date

−

1960, Machine -1, 2, 3

1974, Machine - 4, 5, 6

5

Installed Capacity

−

168 MW (6 × 28 MW)

6

Rated Head 

−

1388 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

6 × 280 ft3/s = 1680 ft3/s

9

Annual Design Generation

−

1190 GWh

10

Transmission Line

−

230 kV Lawpita-Taungoo-Hlawga Line (250) miles

132 kV Lawpita-Kalaw-Thazi- Mandalay Line (1) & (2) (225) miles

33 kV Lawpita-Loikaw-Mobye  Line (22.5) miles

33 kV Lawpita-Phekhon Line (33) miles

33 kV Lawpita-Phasaung Line (77) miles

11 kV Lawpita Line (5) miles

11

Penstock

−

3570 ft (f - 9.3 ft ~ 9 ft)

Baluchaung No. (2)


Baluchaung No. (3)

1

Location

−

 Loikaw Township, Kayah State

2

Creek

−

Baluchaung

3

Construction Starting Date

−

2008

4

Commercial Running Date

−

22.8.2015

5

Installed Capacity

−

52 MW (2× 26 MW)

6

Rated Head 

−

398 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

1800 ft3/s

9

Annual Design Generation

−

334 GWh

10

Transmission Line

−

132 kV Lawpita Line (2.9) miles

11

Pipe Line

−

14141 ft

Baluchaung No. (3)