MINISTRY OF ELECTRIC POWER

Breaking News :

Bago Division


Zaungtu

1

Location

−

Bago Township, Bago Region

2

River

−

Bago

3

Construction Starting Date

−

1.1.1994

4

Commercial Running Date

−

2000

5

Installed Capacity

−

20 MW (2 × 10 MW)

6

Rated Head 

−

89.9 ft

7

Type of Turbine 

−

Kaplan (Vertical)

8

Discharge

−

2 × 1539 ft3/s = 3078 ft3/s

9

Annual Design Generation

−

76 GWh

10

Transmission Line

−

66 kV Zaungtu-Kamanat Line (45.6) miles

11

Penstock

−

672 ft  (2) Nos (f - 16.4 ft)

Zaungtu


Yenwe

1

Location

−

Kyauktaga Township, Bago Region

2

Creek

−

Yenwe

3

Construction Starting Date

−

2001

4

Commercial Running Date

−

2007

5

Installed Capacity

−

25 MW (2 × 12.5 MW)

6

Rated Head 

−

187 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

2 × 883 ft3/s = 1766 ft3/s

9

Annual Design Generation

−

123 GWh

10

Transmission Line

−

33 kV Yenwe-Thayagone Line 1) & (2) (18.5) miles

11 kV Dam Line  (13.5) miles

11

Penstock

−

508 ft (f - 18 ft)

Yenwe


Kabaung

1

Location

−

 Oaktwin Township, Bago Region

2

Creek

−

Kabaung

3

Construction Starting Date

−

2002-2003

4

Commercial Running Date

−

2008

5

Installed Capacity

−

30 MW (2 × 15 MW)

6

Rated Head 

−

152 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

2 × 1395 ft3/s = 1766 ft3/s

9

Annual Design Generation

−

120 GWh

10

Transmission Line

−

33 kV Kabaung-Taung Oo Line (1) & (2) (15) miles

11

Penstock

−

210 ft (f - 21 ft)

 

     Kabaung


Shwegyin

1

Location

−

 Shwegyin Township, Bago Region

2

Creek

−

Shwegyin

3

Construction Starting Date

−

2002-2003

4

Commercial Running Date

−

2011

5

Installed Capacity

−

75 MW (4 × 18.75 MW)

6

Rated Head 

−

135.8 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

4 × 1900 ft3/s = 7600 ft3/s

9

Annual Design Generation

−

262 GWh

10

Transmission Line

−

230 kV Thayagone Line miles (25) miles 11 kV Madauk Line (11) miles

11

Penstock

−

1100 ft , (2) Lines (f - 25 ft)

Shwegyin


Kun Chaung

1

Location

−

 Phyu Township, Bago Region

2

Creek

−

Kun

3

Construction Starting Date

−

2002-2003

4

Commercial Running Date

−

2012

5

Installed Capacity

−

60 MW (3 × 20 MW)

6

Rated Head 

−

347 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

3 × 777 ft3/s = 2331 ft3/s

9

Annual Design Generation

−

190 GWh

10

Transmission Line

−

230 kV Kun-Taungoo Line (37.304) miles

230 kV Kun-Thayagone Line (30.82) miles

11

Penstock

−

1295 ft  (f - 15 ft)

Kun Chaung


Thauk Ye Khat No. (2)

1

Location

−

 Taungoo Township, Bago Region

2

Creek

−

Thauk Ye Khat

3

Construction Starting Date

−

2007-2008

4

Commercial Running Date

−

2013

5

Installed Capacity

−

120 MW (3 × 40 MW)

6

Rated Head 

−

269 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

3 × 2489.3 ft3/s = 7468 ft3/s

9

Annual Design Generation

−

604 GWh

10

Transmission Line

−

230 kV Taungoo Line (13.09) miles

11

Penstock

−

1972 ft f - 28 ft, (1) No

Thauk Ye Khat No. (2)


Phyu Chaung

 

1

Location

−

 (7) miles West of Phyu Township, Bago Region

2

Creek

−

Phyu

3

Installed Capacity

−

40 MW (2 × 20 MW)

4

Rated Head 

−

337 ft

5

Type of Turbine 

−

Francis (Vertical)

6

Annual Design Generation

−

120  GWh

Phyu Chaung


ShweTaung

1

Location

−

Shwe Taung Township, Bago Region(Western)

2

Commercial Running Date

−

16.2.1982  (Machine -1)

5.6.1982 (Machine-2)

16.4.1984 (Machine -3)

3

Total Installed Capacity

−

55.35 MW (3 × 18.45 MW)

4

Type of Machine 

−

 Gas Turbine  GE Frame 5

(JOHN BROWN  Co., Ltd )

ShweTaung

© by MOEP. Powered by Next Hop Co.,Ltd.