Sagaing Division


Thaphanseik

1

Location

−

Kyunhla Township, Sagaing Region

2

River

−

Mue

3

Construction Starting Date

−

1998

4

Commercial Running Date

−

2002

5

Installed Capacity

−

30 MW (3 × 10 MW)

6

Rated Head 

−

62 ft

7

Type of Turbine 

−

Kaplan (Vertical)

8

Discharge

−

2 × 2228 ft3/s = 6684 ft3/s

9

Annual Design Generation

−

117.2 GWh

10

Transmission Line

−

33 kV Thaphanseik-Kantbalu Line (1) (15.21) miles

33 kV Thaphanseik- Ngapyawdaing Line (2) (19.8) miles

132 kV Thaphanseik- Ngapyawdaing Line (36) miles

11

Penstock

−

1472 ft (f - 20 ft)

Thaphanseik


Yazagyo

1

Location

−

Kalay Township, Sagaing Region

2

Creek

−

Nerinzara

3

Construction Starting Date

−

2003-2004

4

Commercial Running Date

−

2015-2016

5

Installed Capacity

−

4 MW (2 × 2 MW)

6

Type of Turbine 

−

Francis (Horizontal)

7

Annual Design Generation

−

21 GWh

Yazagyo

 