Myin Gyan Combined Cycle Power Plant (Sembcorp)

Myin Gyan Power Plant Project is located in Mandalay Region and installed capacity of the project is 225 MW. Power purchase agreement (PPA) for the power plant was signed in 29 march 2016 and the project is now under implementation stage by Sembcorp Myingyan Power Co., Ltd (owned by Singapore).  Project completion is 97.41 % and works in Progress are shown in the figures as follows.

(a) HRSG and Main Stack Unit 1

(b) HRSG and By-pass Stack Unit 2

 

 

Kinda  Hydropower Plant

1

Location

−

 Myitthar Township, Mandalay Region

2

Creek

−

Panlaung

3

Construction Starting Date

−

1981

4

Commercial Running Date

−

1985

5

Installed Capacity

−

56 MW (28 MW × 2 )

6

Rated Head 

−

183.7 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

2 × 1976 ft3/s = 3952 ft3/s

9

Annual Design Generation

−

165 GWh

10

Transmission Line

−

132 kV Thazi Line (48.4) miles

132 kV Kinda-Ingon  Line (32.2) miles

11 kV Ywangan Line (11) miles

11 kV Mong Maw Line (16) miles

11

Penstock

−

100 ft (f - 10.5 ft)

Kinda


Sedawgyi  Hydropower Plant

1

Location

−

 Myitthar Township , Mandalay Region

2

Creek

−

Chaung Ma Gyi

3

Construction Starting Date

−

June, 1984

4

Commercial Running Date

−

6th June 1989

5

Installed Capacity

−

25 MW (2 × 12.5 MW)

6

Rated Head 

−

92.63 ft

7

Type of Turbine 

−

Kaplan (Vertical)

8

Discharge

−

2 × 1592.5 ft3/s = 3185 ft3/s

9

Annual Design Generation

−

134 GWh

10

Transmission Line

−

132 kV Mandalay Line (36.75) miles

132 kV Kyaukpahtoe Line (131.6) miles

11

Penstock

−

150 ft (f - 14 ft)

Sedawgyi


Yeywa Hydropower Plant

1

Location

−

 Kyaukse Township, Mandalay Region

2

Creek

−

Myitnge (Dote Hta Wati)

3

Construction Starting Date

−

2001-2002

4

Commercial Running Date

−

2010

5

Installed Capacity

−

790 MW (4 × 197.5 MW)

6

Rated Head 

−

299 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

4 × 7420 ft3/s = 29680 ft3/s

9

Annual Design Generation

−

3550 GWh

10

Transmission Line

−

230 kV Yeywa-Belin Line (1) & (2) (24) miles

230 kV Yeywa-Meiktila Line (1) & (2) (74) miles

11

Penstock

−

492 ft (f - 22 ft)

Yeywa


Kyaukse Thermal Power Plant  (IPP Rental)

1

Location

−

Kyaukse Township, Mandalay Region

2

Company Name

−

Alstom Power Rental Energy Holding Co., Ltd

3

Project Type

−

BOT

4

Commercial Running Date

−

23.4.2014

8.3.2015

5

Total Installed Capacity

−

102 MW

6

Installed Capacity

−

82  MW ( Phase I) (Gas Engine) Rental

20 MW (Phase II)

7

Type of Turbine 

−

 XQ 1475 Q, Caterpillar / US

8

Annual Design Generation

−

706.248  GWh

 

Kyaukse


Myingyan Thermal Power Plant  (IPP Rental)

1

Location

−

Myingyan  Township, Mandalay Region

2

Company Name

−

Aggreko International Project  Co., Ltd

3

Project Type

−

Rental (20) Months

4

Commercial Running Date

−

10.4.2015

5

Total Installed Capacity

−

95 MW

6

Type of Machine 

−

 Cummins, N HC20/  QSK60 (Plus  model) / UK

7

Annual Design Generation

−

332.10 GWh