MINISTRY OF ELECTRIC POWER

Breaking News :

Nay Pyi Taw Council


Paunglaung

1

Location

−

 Zayyarthiri Township, NayPyiTaw Territory

2

Creek

−

Paunglaung

3

Construction Starting Date

−

1.2.1997

4

Commercial Running Date

−

2005

5

Installed Capacity

−

280 MW (70MW × 4 )

6

Rated Head 

−

340 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

4 × 2701.75 ft3/s = 10807 ft3/s

9

Annual Design Generation

−

911 GWh

10

Transmission Line

−

230 kV Paunglaung – Pyinmana Line (1) & (2) (11) miles

11

Penstock

−

263 ft (2) Nos (f - 28 ft)

 

Paunglaung

Upper Paunglaung

1

Location

−

 (26) Miles East of Pyinmana Township, Naypyitaw Territory

2

Creek

−

Paunglaung

3

Rated Head 

−

260 ft

4

Type of Turbine 

−

Francis (Vertical)

5

Installed Capacity

−

140 MW (70MW × 2 )

6

Annual Design Generation

−

454 GWh

Paunglaung

 

 

 

Nan Cho

1

Location

−

(16)Miles East of Pyinmana Township, NayPyiTaw Territory

2

Creek

−

Nan Cho

3

Construction Starting Date

−

2006

4

Commercial Running Date

−

11.4.2014

5

Installed Capacity

−

40 MW (20 MW × 2)

6

Rated Head 

−

328 ft

7

Type of Turbine 

−

Francis (Vertical)

8

Discharge

−

1674 ft3/ Sec

9

Annual Design Generation

−

152 GWh

10

Transmission Line

−

230kV, Nancho-Paunglaung (7.6) miles

230kV,  Nancho -Upper Paunglaung

11

Penstock

−

263 ft (2) Nos (f - 28 ft)

Nan Cho